Decide if the following statements are true (T) or false (F). Consult pages 9:33 - 9:34 of the book "WiHT", Part 2.
Quiz
When the GROT forwarding has finished, the work report including information such as estimated volume, number of GROT piles, their location, and others is usually given to the client.
T
F
The supervisor is responsible for cleaning up the place of GROT residues after the work is completed.
T
F
When chipping a pile, the chipper operator and supervisor are responsible for not picking up mineral soil and rocks from the bottom layer of the GROT pile.
T
F
Chips should not be left in a container longer than 24 hours before emptying the container when chippng in the winter.
T
F
Chips should not be tipped or blown out on a site with horizontal and even ground.
T
F
Some kind of canvas should be used when chips are tipped or blown out on the ground during chipping piled GROT.
T
F
When chips are stacked, different types of fuel in the same stack can be mixed.
T
F
The recommended height of chip stacks is more than 5 - 7 m.
T
F
The loader operator should avoid loading any pieces of frozen soil and other frozen materials.
T
F
When leaving the stack rounded, there should not be permitted any contamination.