Listen to the recording about "Chipping a pile" (p. 9:34) without looking in the book and decide if the following statements are true (T) or false (F).
When chipping piled GROT, only the chipper operator is responsible for picking up mineral soil and rocks from the GROT pile´s bottom layer.
T
F
When chipping at sub-zero temperature, chips should not be left in a container longer than 42 hours before emptying the container.
T
F
When chips are tipped or blown out on the ground, this should be horizontal and even.
T
F
To reduce the possibility of mineral soil and rocks mixing with the chips when they are tipped or blown out on the ground, some kind of canvas should be used.
T
F
If chips are tipped on a truck road, the supervisor should be contacted as soon as possible.